What are new technologies in civil engr. that can reduce
construction cost?
Answer Posted / bobby nahar
As now day by day all construction machinery are there in market so it can reduce construction cost
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
what is the composition of good brick ?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
Explain what are the phases inspections are done by local authority while construction?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
Concrete cover for slab, column, beam and footing?
Explain what is progress payment?
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
Explain the water bound macadam roag
How much cum. Brick work can do by 1 madon
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.