Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Ceiling fan motor wiring
Hi,
I have 2 ceiling fans broken. The receiver/control units burned out due to
lightening. One Harbor Breeze and one Hunter's
I took them apart (remove receiver units). Now on both of the motor I see 4
wires coming out from each motor
I really want to know the function of each wire.
Are there anyway I can test to see which is which?
After searching forums I know these 4 wires are from 2 sets of coils inside
the motor, one is Start winding and the other is Runing winding

I could not find the receiver/control unit any where, so I am planing to buy
Capacitors and universal remote controls to make the fans run again.

Anyone has any idea how to do the wiring, please help

Thnks

Answer Posted / kamal

Do not attempt self repairs if you have little or no knowledge of electrics or electronics. It is very dangerous. Take to a qualified service technician. You seem to have a remote controlled fan, may need rewinding of motor coils. You maybe able to save the fan.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What do you mean by phasors?

1067


DESCRIBEPNEUMATIC SYSTM OF ASH HANDLING PLANT

5532


1)we have 1000 cfm Blower,Dia-1Mtr,Velocity of air 94 m/s 2)We have Natural Air velocity 94m/s 3If i Put Wind Mill in natural air ,speed is 94m/s Then it will generate Assume 100kw 4)If i put same wind mill across the Blower,air speed is same 94m/s now the Question is Will it generate 100 kw?

1993


in what type of applications v can use q meter?

2125


from which subjects most of the technical que will b asked for hpcl(electrical).pls help me

1998


What is meant by rotor?

1269


what is the acceptable value of TAN DELTA and dissipation factor for 11kV, 1.75HP Motor?.

4175


How will change the frequency in distribution side?

1783


what is induction furnance? how many phase supply given io its coil for 15 or 20 ton furnance?

3402


A 3-PHASE TRANSFORMER IS USED TO STEP-DOWN THE VOLTAGE OF A 3-PHASE, 11KV FEEDER LINE. PER-PHASE TURNS RATIO IS 12.FOR A PRIMARY LINE CURRENT OF 20A, CALCULATE THE SECOUNDRY LINE VOLTAGE, LINE CURRENT AND OUTPUT KVA FOR FOLLOWING.A)STAR- DELTA.B)DELTA-DELTA.

3049


HOW DO YOU CAN CHECK A 15KV DIODE, WHETHER IT IS OK OR NOT?

2038


Define availability (operational)?

1143


What is the difference between alternator and generator?

1297


what is mean by parallel operation of permanent magnet generators

1994


What are the necessary solutions needed to be carried out on a malfunctioned earthing mechanism of a VACUUM CIRCUIT BREAKER.(TAMCO)

2008