Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.

Answer Posted / dr. maninder singh khalistani

Volume of underream=2*3.14*.3*.3*.3/6=. 028m3

Is This Answer Correct ?    2 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Dear Sir What is the Contraction joint for base Slab

1663


What is the effect of a building collapse?

627


what is the list of building construction equipment & teir output?

1699


Rate analysis of 150mm, 100mm, & 230mm thk BBM work

7895


what is E VALUE FOR WOOD

1537






How to calculate cement and river sand material Qty for waterproofing base coat and finish coat

1891


why we are using stub column..? is it possible to construct steel stub column..?

1522


Define What happens to Load at yielding ?

1335


The 4 main factors to start a construction project are––

1796


Which are the top apps for you civil engineer?

727


What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?

1459


what is parametre for M25 after 7 days strength

1527


. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.

1954


Explain how you can turn off the display for dimension in CAD?

721


What tor stands for in tor steel?

632