Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Answer Posted / dr. maninder singh khalistani
Volume of underream=2*3.14*.3*.3*.3/6=. 028m3
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
Dear Sir What is the Contraction joint for base Slab
What is the effect of a building collapse?
what is the list of building construction equipment & teir output?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
what is E
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
why we are using stub column..? is it possible to construct steel stub column..?
Define What happens to Load at yielding ?
The 4 main factors to start a construction project are––
Which are the top apps for you civil engineer?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
what is parametre for M25 after 7 days strength
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
Explain how you can turn off the display for dimension in CAD?
What tor stands for in tor steel?