Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Answer Posted / dr. maninder singh khalistani
Volume of underream=2*3.14*.3*.3*.3/6=. 028m3
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
what is the calculation of raw material for 0.35cum of m-15
rimmer in pile foundation
water leak detection system question & answer
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
Formula of area of crane hook
How to design staircase.plz tell me formula for the design the staircase.
What is missing report and how to prepare
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
Calculation of Pier Cap with tapper area?
how to calculate valuation for the old building?
how to tie 10 legged stirrups
what is constat for brickwork
What out turn civil works