Answer Posted / sunil singh yadav
Stone ballast
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
In cement making,what is meaning of blend,fineness,density.
Different sizes of Hollow blocks and its weight. Thanks.
Define line type?
What is aggregate?
Define What is Civil Engineering?
how to calculate number of bitumen for road asphalt
Time required for curing of wall tiles before fixing
In which code the the maximum height of concrete casting has been explained
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
What is the name of this multiplication factors ?
what is right & short method of measurement of slab&beam
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.