Answer Posted / tarique08
But in fields only 406 nos of bricks are required for 1 m3 of volume
Because of the volume of mortar nos of bricks are reduced to 406 from 500nos
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
Slump Values for works?
What things you need to take care of before building a kitchen island?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
where i can get material costs on weekly basis
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
What is the snap size in civil and how can we create it?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
What is Base Shear ?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
What are the alternate material for steel, Sand and aggregate
what is called the inverd level of mabhole chamber?