Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many plastr work in one bag cement

Answer Posted / shekhar kundena

practically it is 8.194 Sq.M. In practice, maximum masons required 1.5 bags to plaster 100 Sq.Ft.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how many cement used in single story residential building per sqft

1751


in plate load test what is the thickness of plate 20mm 5mm 50mm none

2184


what radial pressure, the NP2 class rcc pipe can sustain?

3420


how will remove spiderweb cracking in plaster ? what the reasone of make it ?

2010


What is the difference between absorption & adsorption and sorption?

1210


I need old MMUP exam question and answer for Civil engineering

1622


what are the changes in concrete pour height as per IS 456, 2009?

3154


what is the service corridor?

2390


roll of DLC in road constructions

1905


how to caluclate sienerge qty in construction in ap

2446


which red: used in roof teping, then use only cement

2019


how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm

2048


3. What are the disadvantages of your present job, things you do not like about it?

2816


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?