Answer Posted / aamu
If we known the length of that perticular line & provision of spacing on that line with addition of one bar extra
Ex. If length of line
=10' &
spacing provided
=6"
no.of bar= (10x12)'/(6') 1
=21 no.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
Explain different types of rcc pipes.
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
what is meant by shear center?????
Write short note on construction programme for pile foundation.
what r the precaution for high in atp tempareture,low in atp tempareture
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
How to build the floor to ceiling bookcase?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
how to disign cuplock shuttering and it's matireal requirement snd any related web site