What is maximum AC & DC transmission voltage in India? and
where?
Answer Posted / venkat iyer
1. AC 765 KV already in service in many parts of India
2. AC 1150 KV with highest system voltage of 1200 KV under progress
3. DC 800 KV already commissioned in Assam
Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
how synchronous condenser is used in place of synchronous generator with out negotiating IEEE standards? Can i use 3 generators as synchronous generators and 2 generators as a synchronous condensers in an IEEE 14 bus system with out disturbing the standards?
What is hipot test procedure?
Which standard we are following earthing resistance test
what is the difference between ac motor and dc generator
what is the step by step formula for calculating bus bar phase and neutral size of a panel board.suppose the incomer of panel board is 100A..???step by step answer please
Use of switch mode power converter in real-time basis?
How can I calculate the Mega watts required to run a plant having many electric motors and other electrical components.
In all analog voltmeters or ammeter showing some small size symbols. as well as a star and in star 2no. digit, resister symbol,and other. what is that's meaning ?
Why we cant store an ac power. If we coo store in which device we can?
Can a generator runs after getting 1st stator earth fault.
What are the effects of adding a zero to a system?
I have a relay contact rated at 220v dc which is supplied with a 24vdc from the panel,for it to trip the dampers(24vdc).What if the application of the relay changes so that it should work at its rated 220vdc then will it work at 24vdc supply given or any other consideration needs to be taken .....
following are the questions asked in interviews: 1) Considering the short circuit fault, which switchgear is preferable, SFU OR MCCB? Which operates faster? whicg one is popular in Indian Market and why? 2)Define SCPD. What is type2 coodination? 3)Why the contactor rating is higher for the fuseless selection than for fuse selection? whether the ratinf of SFU or MCCB remains the same in both the cases? 4)If the HP rating is known then can you calculate the ratings of L.V Switchgear(SFU/MCCB, contactor, OLR) without using the selection chart?
What will happen if we introduce negative feedback to a control system that uses a positive feedback?
what is the operating time for LBB and how does the LBB relay realise whether cb is opened or not?