What is the rating of your capacitor bank at your company.
Answer Posted / sisir kumar singh
the general principle of installing capacitor bank is
take 35% of the connected load.and in a capacitor bank put 12 -15% as a fixed capacitor.
suppose your connected load is 1000 kw then the capacitor bank size will be 350 kvar and the fixed capacitor will be12-15% of 350 kvar that is 42 -53 kvar
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is a fuse? How does it work? What are materials used?
we have two generators different capacity on 15 MW and other 6MW at 11 KV , 15 MW gen. bus short level current 40KA,and 6MW short level current 25KA,, length of cable 100MTR between 6 MW from 15MW gen. for bus coupling . kindly tell any one can we use both NGR OR one NGR from any GEN. BOTH NGR has diff. rating. Tariq pakistan
Do you need any help with FEWA Electrical Supervisor exams?
can i use 2000/5A Clamp meter to measure HT cable
why we are using earth pit in sub stations.?
explain the Trip supervision circuit
Define conversion efficiency of a power amplifier.
1 “earthing” for bonding of equipment and circuits to common plant earth electrode potential, 2 “protective earthing (PE)” when this bonding is required for personal safety provisions 3 “grounding” for interference suppressing bonding of screens, sys-tems with ground level 4. low-impedance earthing ? 5.primary earthing system and secondary earthing system what is that? 6.earthing electrode or mesh net earthing electrode ? very confusing , simple but very informative help required ? i will be very very thankful to you guys.
What is the function of NGR for the parallel operation of alternator? whats happen when different rating of alternator are running with parallel?
What are different types of control systems?
What is the difference between diesel generator engine with and without turbo charger with the same capacity?
what will be project cost for 100 kv transformer connection under oyt scheme.
is it possible to start a motor in felid connected to a remote mcc
i completed my DEEE. and i want to electrical c license. how to get it..?
we have an energy meter in a capacitor bank panel, So should we consider it's readings as energy consumption on daily basis. (when capacitor bank doesn't have any energy losses)