For DG or Transformer body earthing, is it necessary to terminate the earth bus to earth pit directly? If not terminated to earth pit directly in earth pit and connected to any common bus strip which ultimately connects to earth pit, what will be the pros and cons?
Answer Posted / ravi nayak
May be the answer i guess is if not terminated directly to earth pit, in abnormal cases the leakage current will find 2 paths to flow one will be to earth pit and other will be to any other structure/equipment connected to common strip because not terminating in earth pit ensures to form a junction with common earth bus. And hence tending to provide 2 pathways for discharging itself.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the no-load losses for the 11000/415V transformer with the following rated capacity? 1.1500 kVA 2. 2000 kVA 3. 2500 kVA 4. 3000 kVA
what is mean by kneepoint voltage? when it will happen? ( my doubt is, if CT secondary is open means ct get saturation or blas? what are factors are required for calculations? plz give currect anws:
Why do we perform an open-circuit test and short-circuit test on the transformer?
What is the tests required for a 132 kV, 400 kV , 765 kV for a Circuit Breaker and Power Transformer before commissioning ?
WHAT IS THE SIGNIFICANCE OF VECTOR GROUPS IN TRANSFORMER? WHAT WILL BE EFFECT WHEN PHASE DISPLACEMENT CHANGES IN TRANSFORMER?WHAT IS THE NEED TO BE PHASE SHIFT CHANGE BETWEEN THE PRIMARY AND SECONDARY WINDING
what is the ckt diagram of a tubelight and is it the simplest ckt of electrical engineering and also the component?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
define displacement & magnitude ?
What happen in ups if phase reverse?
What is the practical way to calculate the cable size for known ampere load?
what is power factor ? how we can calculate the low power factor and amount of capacitor for improve that low factor ?
how we select ac fuse rating of an power inverter???
Define pole pitch?
What is the role of power pack in substation protection system?
What is s-domain and its significance?