What is the acceptable percentage of slump in Mix concrete?
Answer Posted / vasanthsibi
50 to 100 normal
100 to 160 high
Above 150collapse
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is absolute coordinates?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
What is the use of array command?
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
explain the advantages of total stasion
why do we not deduct volume of steel to find actual volume of concrete in practical???
what is the weight of 6000 psi concrete in lb/cft?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
what is the dimensions of river sand truck trailer or trolly ?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What should be the standard roof height like to be?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
How to calculate laplength for 3 floors
How to arrive dry volume of concrete (1.52 to 1.57) ?