Answer Posted / victorbabu
2000 to 3000 rs
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
What is the cost difference between site mix and ready mix concrete per cubic meter
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
how much required strength of cement concrete bricks(size 230x115x75mm)
How to determine thee cut length for steel reinforcement bars in R.C.C design
whats is difference between anchorage length and development length
what is grade intersection?
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
how to calculate total cost for slab 35'×8'
Can we apply curing compound on ceiling (slab Bottom)
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
Moisture content calculation for diff mix ratio's ??