Answer Posted / yogesh nagpal
5mm or 0.005m
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
What is a projection line?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
How will be cutting in timber plate size 600*400 column size
Define What is an ice dam sock?
how to do cementicious paint for rcc walls of cw pump house
How to construct a water sump in a rocky soil?
What are the responsibilities of a site manager?
Why are the bolts that hold steel rails together in oval holes?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
When was the first motorway built in england?
In earth work 1300 cum soil how to calculate how many liters require in water
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
what is the method used for marking of cantilevers in hirise buildings by using theodolite