Answer Posted / id harish
9"*4.5"*1.5"
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
What is the use of mirror command?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
What is construction mitigation management?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How many axes do cartesian coordinate system has?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
Describe a time when you anticipated potential problems and developed Preventive measures
What is oneside mat. And explain
What are the different types of runners?
what is the percentage of silt in black cotton soil.?
Why should you show Client/Engineer activities clearly on the project plan?