Answer Posted / suresh kumar rihal
Yes because load is uniform distribution load & design is always higher side.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the relation between pitch of steel and depth of slab?
What is the difference between 53 grade and 43 grade cement
how much to get of BRC lapping in full yield and half yield ?
What is change order request?
Mention different types of roof systems?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
What is a projection line?
Calculation of curtain wall of box culvert
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
Which brick is best for construction ,either fly ash or AAC BLOCKS
what is shuttering co efficient?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
How many litres of water used for curing of 1000sqft of slav