calculation of cement bags in 1:2:4 concrete mix
Answer Posted / samran akbar
Dry Volume of Concrete should be 54% of Wet Volume of Concrete
Wet Volume = Dry Volume
1-M3 = 1.54M3
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Please tell me vasthu room sizes. Thanks.
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
What was asked in isro civil interview
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
Sir how to find cutting length for footing steel bars in the shape of "u"
what are RIB slabs explain about it
how calucate cement sand ratio for plstering
What is progress payment?
how much shouid be the rate for ready mix concrete per cubic meter
What is Joule Brayton Cycle?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
How much cement and sand required for 9"brick wall per square metre