Answer Posted / balraj
1. Hold the two bars.
2. minimise the shrinkage.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
How to compute minimum number of columns required for a site from area of site?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
How does a traffic light signal work ?
what is cross hair cursor?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
Where will be the maximum bending moment in a TEE Beam?
How do you calculate the power of a centrifugal pump?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
what is relation between SPT N value and driving piles after conducting a soil test?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
which type of instrument included in plumbing work?name of instrument?