in 1:2:4 concrete, spcify 1,2 and4 as towhat they indicate?
Answer Posted / muthu
M15 - 1:2:4
Cement:sand:metals
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
how to find out hard strata in bored pile when the DMC method adopted.
Tell me about triple point of water.
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is the worlds largest concrete dam?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
Explain major differences between routing maintenance and major maintenance.
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What is the biggest dam in america?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
Which is stronger solid steel rod or hollow steel pipe?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
What are your future hopes for this job?