in 1:2:4 concrete, spcify 1,2 and4 as towhat they indicate?
Answer Posted / muthu
M15 - 1:2:4
Cement:sand:metals
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
difference between trapezoidal and pedestal footing and how the load acts on that
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
difference between fc and fc'?
How do we test on design and style in a software?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
can you provide a link for manual design of building?
The foundations are placed below ground level, to increase?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?