what are the CAD software versions you have used?
Answer Posted / sankar
I am using auto cad 2013
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how much cement and sand required for 1cum rr masonry
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
What is the Unit weight of coarse sand (F.M- 2.20) ?????
What is the difference between a wood shake and wood shingles?
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
How much material will consume for following specification water tank (9*7.5*6 feet)?
what is difference between fluidity and workability also how palsticizer works
What is binding spacing of the rebars at lapping zones.
How do you calculate the unit weight of concrete?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
What is change order request?
How much cement,sand,bricks and water needed for 1square metre brick work?