Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

I have a problem with a valve (air to close).
When it is fully closed and try to open 1% it doesn't responce till 3% open suddenly more than 3% then back to 3%.
I tried to tune positioner then removed it, the problem still exist.
Any idea

Answer Posted / praveen kumar

first decoupled the actuator then ensure and mark on the stem of full opening and closing, then couple the actuator stem and plug on fully 100 % open of marking position. finally to ensure zero passing test.just close the control valve and fil the water on bonnet inlet.same passing tht u feel means place the nut or iron piece something inb/w the coupling.then ensure again on zero passing test.if again feel the passing means pls to do lapping on seating...then take an trail.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why humidity limit is 30 to 55 % for raw material storage?

4210


What is the GK Value in Flowmeter?

3633


Who to difference between analog in & analog out in dcs?

1555


how can i check vortex shedder bar it is ok? if there is ohms condition are shown correct?

2166


Sir, I want junior executive, Instrumentation question papaer for IOCL, Plz send to arabinda.ghosh83@gmail.com

2220


Can I route 110 VDC and 24 VDC in a same Duct for our Interposing relay cabinet? IF yes or NO Please provide me IEEE Std. for the same. Please i required it on Urgent basis, i need to design IRP Cabinets and we have MCC 110VDC and Our Coil side is 24VDC, Please help as soon as possible.

2232


KAlman filter code for two dimension?

2011


please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com

1617


line up procedure for dp type flow transmitter?

1850


while i check zero check for dp flow transmitter some fluctuating came (0 to 458 kg/h) what is the reason?

1817


I have completed B.E. Instrumentation & control in 2009. i have 3 year industrial job experience in chemical plant.now, I want to join M.E. in external. so, Plese say easiet way and good institute name.

1859


when a magnet is heated?

1920


Draw a great bridge circuit.

1967


Why thermo wells are used? What materials are used in thermo wells?

1064


how to work static pressure sensore how to work dpt

1815