why we are condecting the slump test for concrete?

Answer Posted / pijush12

For testing concrete work ability. 75-100 mm slump use for Slab ,beam, column casting.
Pump able concrete slump is taken little high.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

List out some of the checking’s, done at the completion of construction?

813


why demand factor less then 1 ?

1858


why we create short columns under grade slab?

1949


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

2489


suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.

2404






Define Who designed the city of Washington DC?

737


how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?

5868


Which is the direction of negative angle?

719


how to caliculate required amount of cement and sand required for 1cu.m.

1838


hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?

2061


Which prize is the alternative to the NOVEL Prize?

1993


what is the basic difference between Coloumn & Shear Wall

1808


how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm

1674


How to do base isolation for RC framed structure using ETABS software?

3830


what is the Asfalt test?in road constraction..?

1729