what is the proportion of M200 &M300 grade concrete
Answer Posted / pijush12
M200=1:1.5:3 (200 kg/cm2)
(m=20)
M300=design mix follow
| Is This Answer Correct ? | 24 Yes | 12 No |
Post New Answer View All Answers
What are the advantages of cad?
How to build the floor to ceiling bookcase?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What are the joints wants to made in masonry where door opening, arches like etc..
How do you prepare Material Recovery Statement for deduction from contractors bills?
rate analysis hiring of generator 62.5 KVA
what are the proper pipes for salt water line
Process of pcc in wateredug
How is the strength of cement measured?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
explain five benefits of using standard terminology in the measurement process?
what is parametre for M25 after 7 days strength
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
150mm bricks size how many use 4.14 m3