Answer Posted / hi123

Given Data : Column size = 250x400 Clear Cover = 40 mm Dia of Stirrup = 8 mm
Ans: To calculate cutting length first we determine the lengths A and B
So A = 250-2x40+2x(half dia of stirrup) = 250-80+2x4 = 178
B = 400-2x40+2x(half dia of stirrup) = 400-80+2x4 = 328
Deductions : For bents up we must deduct the values that for
45 degree bent = 1d
90 degree bent = 2d
135 degree bent = 3d where d = dia of stirrup
here in our case for the hooks there are 2 bends of 135 degree each
for the stirrup there are 3 bends of each 90 degree
so deductions = 2x3xd + 3x2xd = 2x3x8 + 3x2x8
Addings up ---> we have to add up hook lengths here in our case each hook length = 12 d so for 2 hooks the hook length = 12d+12d = 24d
So now the actual cutting length = 2(A+B)-2x3x8-3x2x8+24x8
= 2(178+328)-2x3x8-3x2x8+24x8
= 1012-48-48+192 = 1108 = 1.108 m.

Note : It is only correct answer I assure to you all which will be the elsewhere worthwhile in whole india you can check up

Is This Answer Correct ?    10 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??

1895


how to find quantity of concrete in PCC M15

1684


How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?

1562


how to workable concrete cube test M-25 design mix

2983


How to construct a water sump in a rocky soil?

1703






can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.

1591


How do you change a dimension value in solidsworks?

781


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

702


(Project Management Topic) What are the important criteria in the successful realization of the project?

1666


from where ican get sample papers for CET-delhi 2012

2043


Define Workability ?

798


i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?

11539


Why are pull-out tests performed for soil nails?

757


What is the cemnent ratio

1828


How much quantity water should be placed in one cubic meter area?

900