a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?
Regards
Answer Posted / hi123
Given Data : Column size = 250x400 Clear Cover = 40 mm Dia of Stirrup = 8 mm
Ans: To calculate cutting length first we determine the lengths A and B
So A = 250-2x40+2x(half dia of stirrup) = 250-80+2x4 = 178
B = 400-2x40+2x(half dia of stirrup) = 400-80+2x4 = 328
Deductions : For bents up we must deduct the values that for
45 degree bent = 1d
90 degree bent = 2d
135 degree bent = 3d where d = dia of stirrup
here in our case for the hooks there are 2 bends of 135 degree each
for the stirrup there are 3 bends of each 90 degree
so deductions = 2x3xd + 3x2xd = 2x3x8 + 3x2x8
Addings up ---> we have to add up hook lengths here in our case each hook length = 12 d so for 2 hooks the hook length = 12d+12d = 24d
So now the actual cutting length = 2(A+B)-2x3x8-3x2x8+24x8
= 2(178+328)-2x3x8-3x2x8+24x8
= 1012-48-48+192 = 1108 = 1.108 m.
Note : It is only correct answer I assure to you all which will be the elsewhere worthwhile in whole india you can check up
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
How to find permissible diagonal tensile stress in reinforced brick work
what are the five benefits of using standard terminology in the measurement process?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
what is flashing?
what are the ffactors you considered choosing the course?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
Why is concrete cube test carried out?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
Why joints are provided?