how to differentiate between "ALL fuel lost" and "All Flame Lost" in Boiler MFT condition?
Answer Posted / pravin
All fuel loss means tripping of fuel systems like all Mills,closure of ldo& hfo trip valves,
All flame loss, if any burner elevation is in service and flame scanners senses no flame this tripping occurs,,
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what's the moog valve
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
what is the basic use of power plant in equipment
what is natural frequency of turbine shaft .
operation
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
what is the difference between compensated & normal drum level in boiler drum?
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
How to calculate power press toneage
How We Calibrate the vaccum transmitter?
What is difference between secondary Air & Tertiary Air and Their use.?
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525