Answer Posted / engr.shahbul
EDO - Electrically Drawer Operated.
MDO- Mechanically Drawer Operated.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What is the HVDC Transmission System? What are the conditions applicable to lay an HVDC Line?
we all know voltage is a force(emf), and the force always devides if 2 or more than2 loads are there but why does the voltage remains same is parallel, it must devide na ???
primery try cell?
how to calculate the settings for shaft ct protn in hydro generators
A cotter joint is generally used to transmit
What is mathematical model of a control system?
Draw the vector diagramme for Asynchronous Induction Generator at noload,half load and fullload.
please suggest some good universities with low cost iam in totally full confusion so please help me my profile gre 283 and ielts 5.5
How we can calculate the Amps for the cable Ex:- For 1sqmm wire how many amps we can draw (calculation)
I am experienced with house and industrial wiring but I don't have any licence how can I apply an licence and which type of licence i can get i didn't complete deee just only experience
What is pi controller?
7- What is the Dissipation Factor and the difference between it and Insulation Resistance Test? 8- What is the task (function) of DC and AC reactors in power plant? 9- What is the task (function) of (open delta with earthed) in some types in transformers? 10- What is the base of the selection of the vector group in transformers? 11- What is the zig-zag transformer and its function by drawing in large detail? 12- What is the polarity ? 13- Why we make short between phase(R) in high side and phase (r) in low side in vector group test? Where High Side ( R ,S and T ) and Low Side ( r ,s and t ). 14- What are the time on delay and time off delay? 15- What is the vector group? 15- What is the task (function) of different types of vector group such as Dyn11 , Dd0 , YNd1,……..,?
EHV current carrying parts need to have smooth finish,then how can a 245kv GIS with emery finish can run so long?
what do you mean by class PS CT and what are technical details needed for calculating it?
In an ACB shunt trip coil and undervoltage coil operated normally( breaker open and charged). But closing coil not operating untill manually discharge and recharging. Any help.