Answer Posted / sekar
Cement = 3.14bags
Sand. = 0.46 cu.ft
12mm thick in plastering
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is meant by Crystal Concrete?
crank types
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
what is the water cement ratio for plastering
What are the skills required to become an architect?
What are the advantages of cad software’s?
How does siphoning work?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
What are the causes of building collapse?
why we are using stub column..? is it possible to construct steel stub column..?
can you provide a link for manual design of building?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
Why are the bolts that hold steel rails together in oval holes?