Answer Posted / ahilan
NETCH(Net Change Planning): Material that undergone any changes, inbetween the last MRP and current MRP are taken into the account.
NETPL(Net Chane for Planning Horizon): Material that undergone any changes, since the last MRP within planning horizon.
NEUPL(Regenerative Planning): It checks the entire change inside the plant.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is MRP procedure
How to attach a drawing for a material to bom ? Is it possible ?
What is standard order type
Difference between Item categories or what is variable size item or non stock item.
What are the basic dates?
Difference between MD01, MD02 and MD03.
What are all the steps involved in Variant Configuration?
Why the work scheduling view is required for semi-finished and finished products?
What is plm (product lifecycle management) in sap pp?
What is process keys
Explain what is “work center” in sap pp and what is the use of data in work centers?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
You want to insert an inspection check point at the end of an operation. How would you do that?
What is the use of mrp pp evaluations?
Explain what is the meaning of exploding a bom?