ENVIRONMENTAL ENGINEERING - QUESTION 22.1 : In order to predict the wastewater production, the population number has to be understood. The population data is : 72000 (for year 1961 or P-1961), 85000 (for year 1971 or P-1971), 110500 (for year 1981 or P-1981). (a) Find the average population increase, or [ (P-1981 - P-1971) + (P-1971 - P-1961) ] / 2. (b) Find the average percentage population increase, or [ (P-1981 - P-1971) / P-1971 + (P-1971 - P-1961) / P-1961 ] / (2) X 100. (c) Find the incremental increase or P-1981 - 2 (P-1971) + P-1961. (d) Let Po = P-1981. After 2 decades or n = 2, the population is P-2001. By using arithmetical increase method, find P-2001 = Po + n (Answer for a). (e) By using incremental increase method, find P-2001 = (Answer of d) + n (n + 1) (Answer of c) / 2. (f) By using geometrical increase method, find P-2001 = Po [ 1 + (Answer of b) / 100 ] ^ n where ^ is power sign, or 1 ^ 2 = 1 x 1 = 1. (g) If the actual P-2001 = 184000, which method of estimation is more accurate, based on your answer in (d), (e) and (f)?
Answer Posted / kangchuentat
ENVIRONMENTAL ENGINEERING - ANSWER 22.1 : (a) Average population increase = [ (110500 - 85000) + (85000 - 72000) / 2 = 19250. (b) Average percentage population increase = [ (85000 - 72000) / 72000 + (110500 - 85000) / 85000 ] x 100 / 2 = 24.025. (c) Incremental increase = 110500 - 2 (85000) + 72000 = 12500. (d) P-2001 = 2(19250) + 110500 = 149000. (e) P-2001 = 149000 + 2 (3) (12500) / 2 = 186500. (f) P-2001 = 110500 (1 + 0.24025) ^ 2 = 169973. (g) Errors of answers : (d) 184000 - 149000 = 35000, (e) 184000 - 186500 = -2500, (f) 184000 - 169973 = 14027. Answer (e) or incremental increase is more accurate to such data, or the most accurate prediction among the three available formulae. The answer is given by Kang Chuen Tat; PO Box 6263, Dandenong, Victoria VIC 3175, Australia; SMS +61405421706; chuentat@hotmail.com; http://kangchuentat.wordpress.com.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is a good device to use for obtaining viscosity data for a non-newtonian fluid?
Can you pls tell me how to calculate the amphere rating of cable in case of three phase supply but all load is single phase
i am a student of thapar university final year.can anybody please help me with the exam pattern of the companies:engineers india ltd. ; iocl ; UOP, HPCL. If psbl plz send me the previous years questions on this email id k_arora1987@yahoo.com. i d be really greatful
what is designing step of heat exchanger
How to size the cooling tower sump / basin for any given circulation rate? What is the guideline?
Explain the working of a spray condenser?
can you explain about the design calculations and procedure of boiler
What is difference between Piping Standard & Piping Specification ?
What is % of piping & equipment cost for a chemical plant having batch process?
What is the procedure to estimate the friction factor involved in heat exchanger tubes?
What are the problems that are associated with the expansion joints?
I am pg student of chemical engg. I am intrested Heat Transfer Subject . I want information about advance heat transfer related PG PROJECT
What are the applications of screen analysis in the chemical industry?
What are the various utilities of the process plant?
have any one question paper of institute of plasma research center for aptitute as well as technical?