Answer Posted / mohamed ibrahim
variant means that you have the same components with various product
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How did you configure the payscale structure?
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
List out the activities carried out in production planning?
Why and how you calculate WIP?
What is the data you give in S.O.P screen?
What is a ‘routing’ in pp?
How costing is affected the pp?
What are all the settings done for configuring the integration of pp with fico?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is planning file entry
Explain variant configuration
In cost controlling information system mention the fields that are listed in the list screen of the report?
Difference between MD01, MD02 and MD03.
What are all the 'sub-components' of production orders?
• How are basic order dates determined?