Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

PROCESS DESIGN - EXAMPLE 21.3 : According to a heuristic of chemical engineering plant design, assume a pressure difference dP = 4 psi for each 10-ft rise in elevation. A pump is needed to pump liquid from a storage tank at a lower elevation to a heating tank at a higher elevation with the elevation difference of 60 ft. (a) Find the pressure loss due to such elevation. (b) If the required minimum inlet pressure to the heating tank is 9 psi, with 1 control valve is installed between pump and heating tank, what is the dP minimum required for the control valve and the entrance to the heating tank when the heuristic mentions that at least 10 psi is required for the control valve? (c) The pressure at the inlet of the pump is 8 psi and the flowrate of the liquid produces pressure head of 50 psi. What is the total pressure produced by the pump? (d) Assume a pipeline dP of 2 psi / 100 ft for liquid flow in a pipe according to heuristic, what is the approximate maximum length of the pipe in ft that can be installed between the pump and the heating tank?

Answer Posted / kangchuentat

PROCESS DESIGN - ANSWER 21.3 : (a) dP = (4 psi / 10 ft) x 60 ft = 24 psi. (b) dP = 9 + 10 = 19 psi minimum. (c) P of pump = 8 + 50 = 58 psi. (d) dP for pipe = Answer of (c) - Answer of (a) - Answer of (b) = 58 - 24 - 19 = 15 psi. Maximum length of pipe = (100 ft / 2 psi) x 15 psi = 750 feet. The answer is given by Kang Chuen Tat; PO Box 6263, Dandenong, Victoria VIC 3175, Australia; SMS +61405421706; chuentat@hotmail.com; http://kangchuentat.wordpress.com.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the reasons of removal of particles from effluent gas?

999


send me previous year question paper for ongc gt 2011 written exam

3387


What is some common piping materials used to transport slurries?

1200


Name some common problems associated with dense phase pneumatic conveying?

1087


What compounds are responsible for the odors that come from wastewater treatment plants?

1132


What are some characteristics of bulk solids that can affect their ability to flow properly?

1167


What are the different ways in which solids can be blended?

1052


Are some heat transfer services more prone to tube vibration that others for a shell and tube exchanger?

1283


i m a frsh chemical engineer now i m confuse to attend the interview so anybody pls send model question papers to this christ_vivek33@yahoo.com

2207


What types of pneumatic conveying systems are typically used?

1052


What is a good relation to use for calculating tube bundle diameter?

1018


What are the criteria’s involved in choosing mass balances for components?

1197


How 'saltation velocity' is used in designing pneumatic conveying systems?

1132


How does a cyclone separator work?

1123


how does refractive index detector work?

2769