do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
How to find beam R/F cutting length
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
what is shuttering co efficient?
difference between fc and fc'?
What is zoning permit?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
What is thumb rule in quality and quantity estimation of a Residential building??
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
How many days should curing of plastering, brick work and concrete