Answer Posted / rajkumar
considering for 1 sqm area, then dry volume of mortar= 1*1*.025= .025 cum
for wet volume of mortar increase it by 20%
so, 0.025*20%+0.025 = 0.03 cum
now considering ratio of 1:4 then 0.03/1+4 =0.006/0.0345(volume of 1 bag) =0.18 Bag
for kg = 0.18*50 =8.7 kg/sqm
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
What are the different methods for drawing an arc?
Questions related to civil.engg in company
How to calculate material and labor required for 100 m2 plaster?
Define What are the uses of Groynes?
what is E
difference between fc and fc'?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
What is the crank length in the slab?
How many types of slabs are there & how to design it?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
How to calculate brick work quantity?? Block work quantity??
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
what is that one cub metre plaster in cemant and fine sand
What is the basic difference between OPC
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY