Answer Posted / satish
Pile foundation is the on off the deep foundation is transfer load off superstructure to surface area it will be mainly used pile foundation is provided with low bearing capacity of soil
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the main reasons for conducting pull-out tests for soil nails?
what is directivity effect?
Why are steel plates inserted inside bearings in elastomeric bearing?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
what is total volume of ingredients used in concrete accordingly
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
what is the name of shuttering oil used in oman
what is the relation between pitch of steel and depth of slab?
Are you ready to relocate with your immediate family to United States as a new employee?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.