Pile length- 10 m
Pile dia- .15m
10X.15X.15=0.225
0.225X3.142=0.7069
Ans:07069
Is This Answer Correct ? | 5 Yes | 7 No |
Post New Answer View All Answers
How to calculate brick work quantity?? Block work quantity??
what is the water-cement ratio of mix design while 30mpa in 7 days?
Dear Sir What is the Contraction joint for base Slab
What out turn civil works
What is Gsb tollens ?
why the openings of sieves are square io size?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
The concrete slump recommended for beams and slabs; is?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
Wats the formula of eccentric footing and how was calculated from concrete qty
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
TELL ME THE EQUATION FOR OGEE SPILLWAY
What is the distance between railway tracks?