In an existing power plant (phase I) with step up transformers (3nos) with Ynd1 vector group to the 400KV bus bar,an extension power plant (phase II) with transformers (4nos) with Ynd11 vector group >. what are the consequences of such configuration ,please note that % impedance are also differ i.e. 15% & 10.5% the reason was that auxiliary supply interface is at different voltage levels i.e 400v & 6.6KV in phase i and phase II respectively .please advise ! Thank you !
Answer Posted / mohammed
My reply was not to accept this configuration as it may cause a forced synchronize and floating currents and at the 400KV bus bsr hence false tripping during switching of remote parts of the grid !
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is noise in modulation?
What is the use of water table & Kreb stone for drain
Which is the fastest logic ?
Explain how can one quickly estimate the additional pressure drop to be introduced with more tube passes?
Sir,I am going to sit for IOCL written test exam. recently.Can anyone tell me the name of 'Objective type Question Book on Instrumentation Engineering ' which will help me. Pl. mail to bidyut_71@rediffmail.com / bidyut.saha2008@indiatimes.com / bidyut.saha09@yahoo.in
what is high type road and low type roads
Explain how to measure crank web deflection?
What is blood brain barrier?
What are the properties of FFT? What happens when you pass a signal of 1000Hz through an FFT?????
Tell me what is seam?
What is relation between transmission lines & Communication lines ?
salam,hi, i need to know what the spesification of 300amp msb...
Which two groups of management manages the control organization and what are their responsibilities?
What is point contact diode?
How to find beam R/F cutting length