Answer Posted / rohit singh
2. 65
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
What is the zero value in quantity surveying
What is the method of soil replacement test?
what is the maximum number of course that can be laid according to IS code and the max height.
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
why we use 19x9x9and 20x10x10 but not other
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
How to do base isolation for RC framed structure using ETABS software?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
How can explode a block?
In which code the the maximum height of concrete casting has been explained
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?