A person has certain number of cows and birds they have 172
eyes and 344 legs.how many cows and birds does he have?
Answer Posted / aditya rai
The person has 0 birds and 86 cows .
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
A rectangular tank can hold m litres of milk. Find how many litres of milk can a tank hold when all its dimensions are doubled?
What is the perimeter of the quadrilateral?
one question has last part like difference between two terms is 9 and product of two numbers is 10, what is the squares of sum of numbers?
if a man reduces the selling price of a fan from 400 to 380 his loss increases by 20% .cost price of fan is.
The numbers A, B and C make a sum of 98. If the ratio A:B is 2:3 and that B:C is 5:8, the third number would be
Financial aptitude
Integral ET(epsiolan transpose)*sigma*dV P=strain displacement vector Q=stress-strain deformation Find [K]
A certain street has 500 buildings. A sign-maker is contracted to number the houses from 1 to 500. How many zeroes will he need?
A boy asks the relation of two people walking along the street. One of them says that the lady walking with him is the daughter of his mother's only son. What is the relation between the two people?
Y catches 5 times more fishes than X. If total number of fishes caught by X and Y is 48, then number of fishes caught by X?
Using the digits 1,5,2,8 four digit numbers are formed and the sum of all possible such numbers.
A person was fined for exceeding the speed limit by 10 mph. Another person was also fined for exceeding the same speed limit by twice the same. If the second person was travelling at a speed of 45 mph. find the speed limit .
which questions are asked in pnb related tocomputer and marketing apptitude
During a given week an author spends 1/4 of his time preparing first drafts, 3/8 of his time editing the drafts and the rest of the time in preparing final drafts. If he works 48 hours during the week, how many hours did he spend in preparing final drafts?
A can work three times as B can work. If A takes 60 days less than B to complete the same task, calculate the number of days when both A and B start working together on the same day.