Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the mixing ratio of M7.5,m10,M30,m35&m40?

Answer Posted / nagaraj

M7.5=1:4:8
M10=1:3:6
M15=1:2:4
M20=1:1.5:3
M25=1:1:2

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

2047


Write short note on construction programme for pile foundation.

5387


why development length = 50D . why not 100D

2011


Calculation of Pier Cap with tapper area?

6296


How to calculate volume of concrete & steel on tank foundation & ring wall ?

1548


Are you ready to relocate with your immediate family to United States as a new employee?

5364


Define What does civil status mean?

1361


which are the Indian auther books for STONE COLUMN/GRANULAR PILES?

2376


1:4:8 pcc calculation 591 cu.ft

2267


Which are the Steel tests ?

1208


how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?

2456


3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.

2092


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1450


In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?

2046


Critical Path Method is...

2064