We are working building soling work so soling thickness given 230mm but total are 50 cum. So I am purchased how meny tons is here spreading plz. Tell me
Answer Posted / naresh
its simple bro
1 cum soling material have 1.55 tone weaight so 50x1.55=77.5 tone
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Special thing in designing a overhead reservoir ? which is different from an ordinary design
what are the layers of the national and heir aprox thickness??
What is the strength of cement?
The largest size of paper used in plotter to print the drawing made by Autocad .
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
why we use aggregate,sand with cement in concrete?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
What is critical path method (c.p.m)?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
significance of specific surface area of particles?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).