Answer Posted / islam alam
Steel in slab =1%
So, 1M3 concrete
(1x1)/100= 0.01x7850
than 78.50kg
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What do you understand by “preset” during the installation process of bridge bearings?
why do we provide haunches in rcc box or underpasses?
What is min thickness,min grade of conc & age of PQC ?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
IS code for Rolling Margin of steel
what would be the design load of R.C.C Cooling tower per cell.?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
what are the values of compressieve strenght?
What is braced excavation all about?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
i want texture painting pwd data
What are the benefits of rcc pipes over steel designed pipes?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.