can we half project in parallel jobs and half project in
server jobs?
Answer Posted / subbuchamala
in one project you can both server and parallel jobs.
People use both type of canvas to develop jobs based on their requirements.
Using sequence job, you can call both types of job along with other actvities
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How can we improve performance of data stage jobs?
Why we use surrogate key?
What is ibm datastage flow designer?
How do u convert the columns to rows in datastage?
Hi guys, Please design a job for dis requirement with derivation(solution). my source table like dis. emp_no qualification 1 a 1 c 2 a 3 c 3 b To loaded to target like dis emp_no qualification 1 b 2 b 2 c 3 a my requirement is every employer have three qualifications i.e a,b and c. what qualification missed in source table that will be move to target systems. Hope u got it the requirement. Right Thanks.
What is ds designer?
What is apt_config in datastage?
What are routines in datastage?
Source has 2 columns: USA,NewYork INDIA,MUMBAI INDIA,DELHI UDS,CHICAGO INDIA,PUNE i want data in target like below: INDIA,MUMBAI1 INDIA,DELHI2 INDIA,PUNE3 USA,NEWYORK1 USA,CHICAGO2
What are iconv and oconv?
Which warehouse using in your datawarehouse
What steps should be taken to improve Datastage jobs?
What are the important features of datastage?
To see hidden files in LINIX?
What is the difference between operational data stage (ods) and data warehouse?