fluid flow takes place due to its:-
viscosity,comprssibility,surface tension,deformation
undershear force
Answer Posted / manish choudhary
due to deformation under shear force of layers
Is This Answer Correct ? | 51 Yes | 5 No |
Post New Answer View All Answers
Describe the sections included in a typical bill of quantities
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
Time required for curing of wall tiles before fixing
what is diffrence between catchment area,watershed and basin?
How to calculate woden area in sft and Cft
What Are The Different Type Of Slump Test Indications?
What do we mean by partial moment release ??
how gradation of aggregates effect on slump of fresh concrete?
Questions related to civil.engg in company
How will you Engage Labours on Site?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
How do you measure concrete?
How to calculate unit weight of concrete for m40 grade.
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.