fluid flow takes place due to its:-
viscosity,comprssibility,surface tension,deformation
undershear force

Answer Posted / manish choudhary

due to deformation under shear force of layers

Is This Answer Correct ?    51 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Describe the sections included in a typical bill of quantities

1794


WHAT GOAL DO YOU HAVE IN YOUR CARRIER?

1879


Time required for curing of wall tiles before fixing

1776


what is diffrence between catchment area,watershed and basin?

2500


How to calculate woden area in sft and Cft

1107






What Are The Different Type Of Slump Test Indications?

823


What do we mean by partial moment release ??

3369


how gradation of aggregates effect on slump of fresh concrete?

1833


Questions related to civil.engg in company

1580


How will you Engage Labours on Site?

1416


Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?

1385


How do you measure concrete?

776


How to calculate unit weight of concrete for m40 grade.

3439


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1285


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

1676