how must steel will use for 1 cubic meter.formula of steel
for beam,column,lantern.
Answer Posted / faisal
100kg per mt3
That gives for slab 4 inches about 100sq ft would require 1 quintal..only a thumb rule ...exact depends on design
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
What are the different types of foundation?
I need old MMUP exam question and answer for Civil engineering
How many square meter can mason layout chb per hour
what is that one cub metre plaster in cemant and fine sand
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
How to design staircase.plz tell me formula for the design the staircase.
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
For what purpose bedding is used under storm water drains, explain?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
How much time Required for PPR pipe network testing
what is difference between fluidity and workability also how palsticizer works
pls tell me about method of cutting length of ties column
pls give me ans to ACT formula cube testing porpuse
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
The portion of a brick cut across the width is called?