Answer Posted / bhuvnendra upadhyay
19cm*19cm*9cm
Frog size 10cm*4cm*2cm
| Is This Answer Correct ? | 14 Yes | 6 No |
Post New Answer View All Answers
why development length = 50D . why not 100D
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
When was the first motorway built in england?
How to calculate quantity of plum masonry in 1:3:7
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
What is the zero value in quantity surveying
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
How do we calculate absolute pressure?
Explain the different types of roofing systems?
What is the difference between a wood shake and wood shingles?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
How to determine thee cut length for steel reinforcement bars in R.C.C design
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.