Answer Posted / chalam
150mm x 150mm x 150mm
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is diffrence between catchment area,watershed and basin?
Define polar co ordinates.
What glue is least sticky?
How many litres of water used for curing of 1000sqft of slav
What is hybrid foundation?
What is an object snap mode?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
cement and sand required for one block of size 0.23*0.15*0.46
Does brick grows bigger every year?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
Explain major difference between auto level and dumpy level?
Explain creep?
What is semirigid connections?
what are the challenges of being a team leader and a supervisor?