curing of concrete why 7day's,14day's 21day's 28days
Answer Posted / mohd. asif zafar
Concrete is tested on 7th, 14th 21th or on 28th day in order to ensure that the day of testing is a working day. Suppose the cubes are casted on Monday, then the testing day i.e. 7th day after casting will again fall on Monday. Since on most of the places there is no work on Sunday, therefore no cube will be casted on Sunday and thus there will be no cube for testing on the next Sunday. Because of this this has become practice throughout the world to do testing on 7th, 14th, 21st or 28th day.. Lateron it was made standard for testing of concrete to perform testing after these days.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
PL.tell me about civil engineering questions with answer
what are the duties of Site Engineer in work site?
What is diversion tunnel in a dam?
what is the steel difference between np-2 and np-3 pipes and weight also
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
What type of tensile strength is handling by crank in beam? Thanks.
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
How do you calculate the power of centrifugal pump?
What is meant by dimensioning?
what is grade intersection?
What Are The Different Type Of Slump Test Indications?
How to calculate quantity of plum masonry in 1:3:7
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
how i can tak Quantity of mortar in block work
What is the cemnent ratio