Answer Posted / prabu a r
L- long time stands for over load protection time delay settings.
S- short time stands for short circuit time delay settings.
I- instaneous stands for instaneous short circuit time delay settings.
G- ground stands for earth fault time settings
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
how to compute kAIC? with formulas...
how to select electronic timer(Star-Delta) setting for diff. rating motors
What is deference between MCB & MCCB & ISOLATOR
How to calculate loses in transformer of 160 KVA ?
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit
If VFD is On but no starting commond on it. so how many outpout voltages of VFD
What is the earth treantment procedure?
If short circuit ratio is high is it bad or good for a machine then tell the reason...
What is the difference between a 3 winding and 2 winding Potential Transformer
What are the various types of rotor used in the alternators?
WILL SCHNEIDER MAKE ACB(MASTERPACT)TRIP ON REVERSE POWER?
What is the loss of transformer of 220kv/11kv, 63/80 MVA and 18.05% impedance
what are the assumptions made in swineburne's test?
from where the self excitrd induction generator get the power?why is the voltage regulation is poor of seig?
what is RFCT and Insulgard Relay & It's function?