Answer Posted / danish
if you are going to built structure on soft soil then you should check at which point there is a hard strata, if you found it at nearer depth, it will be good otherwise you should adopt raft foundation or pile foundation. in most cases pile foundations are used. one thing is important in that case that you should have to maintain the air gap below the ground beam otherwise it can be damaged by uplift pressure of soil as the black soil having the tendency of uplifting during rainfall.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How many mortar required for Brickwork of 1 Cu.m works??
How much quantity of rod binding work by a rod binder per day
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
How to find the cuplock pipe qty in staging for Minor bridge?
What is an ice dam sock?
Why are separation membranes used between concrete pavement slab and sub-base?
How to calculate quanty of steel in four leg stirrups?
how is the reinforcement is distributed in triangular slab
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
what is modular brick and it size
what is civil all interview questions
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?