Answer Posted / hariskumaar
The first process in MRP is the checking of the planning file entry.
The planning run and the scope of the planning run (which materials are planned in which planning run) are controlled by the planning file.
The planning file contains a list of all materials relevant to the planning run. As soon as a material master record is created with MRP data and a valid MRP type, this material is then automatically included in the planning file.
During MRP run at plant level system checks for the materials which are having indicator activated in planning file and plans those materials and will not plan the materials for which this indicator is not activated….this reduces the run time of the MRP..
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are the levels of batch, explain batch determination process?
Question related to Production order status or status profile?
How is indian slab and us slab?
What is the SPRO Path for requirement class and req. type?
What is processing class, where we do them and why?
What is the use of mrp pp evaluations?
What is MRO area & MRP group & some difference
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
Difference between Item categories or what is variable size item or non stock item.
What are the reports generated in product cost controlling information system?
How do you get the system to update this value from the routing?
In sap-pp what are the costing parameters?
Can any body explain me why work scheduling view is required for semi finished and finished products?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
Splitting of production order & product version