How to calculate labor requirement or requirement of labor
projction for a proposed multistoried building for which
quantities of different items of work has been already
calculated stage wise ?

Answer Posted / sridhar

With the known quantities and rate analysis published by CPWD, w e can easily derive requirement of labour projection for the project

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..

2094


Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......

1740


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1421


density of crush sand & crush stone or grit powder

6318


How to calculate quanty of steel in four leg stirrups?

1470






What are the benefits of rcc pipes over steel designed pipes?

795


by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)

1701


The concrete slump recommended for beams and slabs; is?

775


How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?

5833


How do You Maintain a structure after getting cube test of low strength.

1841


hai, kindly send anyone for output workers format details for construction project in foundation to finishing.

1078


What are the causes of building collapse?

672


how to remove the quantity of metal 1 and metal 2 in concrete

1544


Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct

1028


What is Critical path in Ms-Project ?

706